Utilities must approve power export to the grid, even if you do the physical installation 100% off the books. It's called “Permission to Operate”, which requires permits and passed inspections. You can’t just unilaterally add shit to the power grid.
https://www.energysage.com/solar/solar-interconnection-what-you-need-to-know/