all 17 comments

sorted by: hot top controversial new old
[–] 22 points 1 month ago (4 children)

Give me six hours to chop down a tree and I will spend the first four thinking about it.

  • source
  • hideshow 4 child comments
  • [–] 17 points 1 month ago (6 children)

    Recently begun medication and am able to skip the entirety of the green, now I have hours where there is nothing that needs doing.

    How do normal people deal with this.

  • source
  • hideshow 6 child comments
  • [–] 2 points 1 month ago (2 children)

    I'm already maxed out and still waiting for that effect :(

  • source
  • parent
  • hideshow 2 child comments
  • [–] 1 point 1 month ago (1 child)

    Are you on the one that has a building effect?

    Oto-something?

    Elvanse here.

  • source
  • parent
  • hideshow 1 child comment
  • [–] 2 points 1 month ago

    used ritalin for years and now am on Elvanse since January. so, i feel that it helps, bit only retrospective... like "yeah the last two weeks i was more likely to get something done". i heard that it is normal to sense when the effect starts and fades in the evening, that i don't have at all.

  • source
  • parent
  • [–] 9 points 1 month ago

    Using timers really helped me. "Ugh those dishes will take HOOURRSSSAAA"

    I do themband time it and it was 2 minutes. still hard to trick myself every time.

  • source
  • [–] 7 points 1 month ago (1 child)

    🟥 Time spent actually doing it

  • source
  • hideshow 1 child comment
  • [–] 6 points 1 month ago

    that yellow area is a bit too big

  • source
  • [–] 5 points 1 month ago

    the fucking dishes and the fucking laundry

  • source