Because the last time a Liberal PM built a pipeline it was too divisive and costly, this PM will checks notes do exactly the same thing again.

TMX 2: Electric Boogaloo!

Any bets on initial-final cost spread this time?

all 5 comments

sorted by: hot top controversial new old
[–] 12 points 4 months ago (2 children)

Eat shit Danielle, hope you die.

  • source
  • hideshow 2 child comments
  • [–] 11 points 4 months ago

    The idea is to use the existing corridors, thereby bypassing a lot of the legal requirements for third party right of passage.

    Unfortunately for them, there’s still a LOT of environmental assessment that applies, and some of that has to deal with what let the last one go through, which was max overall flow levels. Doubling the flow will put the levels WAY over the previous impact assessment values, which in a sane world would make this proposal DOA.

  • source
  • [–] 1 point 4 months ago

    Makes sense. It will cost way less money when shit hits the fan and they need to funnel it down south to Danielle Smith's new country. /s

  • source
  • 3 comments in c/canadapolitics@lemmy.ca view that post
    [–] 4 points 4 months ago

    Oh, now Alberta needs Canada? Alberta separatists can go fuck themselves.

  • source
  • [–] 1 point 4 months ago

    Nobody gives a shit what that fascist traitor says. Except, perhaps Carney.

  • source