The sheer volume is what stresses me

you are viewing a single comment's thread
view the rest of the comments
[–] 9 points 1 month ago (2 children)

I'm better at doing a huge amount of work than a small amount. If I've got 5 minutes of work to do, I've got a bunch of time to think about how little I want to do it, and often end up putting it off. If I've got so much work that I have no free time at all, then I just get started with the work without even thinking about it, and keep going until it's done.

  • source
  • hideshow 2 child comments
  • [–] 3 points 1 month ago

    Im the same way. If i have 30 minutes here or there, i convince myself that its not enough time to get anything done and itll take me more time cleaning up than actually doing anything.

    If my wife and kids are gone for a day, I'm busting projects out left and right. Last time, i patched 2 holes in walls, and about a dozen damaged parts from nails/hooks, cleaned out the garage and basement and took countless truck loads of stuff to be donated in boxes that we never opened after we moved into our house 2 years ago

  • source
  • parent