(everyone knows roading budgets usually blow out - the total final cost of Transmission Gully appears to be $2.5bn – double the projected cost of $1.25bn).

all 10 comments

sorted by: hot top controversial new old
[–] 7 points 7 months ago (3 children)

How many years of free public transport would $22B buy?

I recall the 50% price cut during COVID (for the whole country) cost the government a few hundred million for a year. This was during COVID so it didn't get higher uptake, but let's assume there was a higher uptake and make it $500M for 50% off per year, or 1B for free public transport per year.

We could have free public transport for everyone for 22 years for the price of this one road.

  • source
  • hideshow 3 child comments
  • [–] [S] 9 points 7 months ago

    In the article they came up with a few other things 22B would buy:

    • four City Rail Links ($5.5b)
    • seven fully equipped Dunedin hospitals ($3b)
    • seven Cook Strait ferry terminals ($3b)
    • 99 contract-cancellations for no Cook Strait Ferries ($222m)
    • fully funded 7kwh solar panel and battery systems for all 700,000 dwellings in Auckland and Northland ($21b)
    • 169 times the annual walking and cycling budget in the 2024 GPS ($130m)
    • Enough funding to run the Te Huia train between Auckland and Hamilton for 3780 years…
    • … or, how about free passenger rail across the whole country for effectively forever?
    • four and a half Northwest Busways ($5b)
    • seven Airport to Botany Busways ($3b)
    • 22 twice-built International Convention Centres ($1b)
  • source
  • parent
  • [–] 5 points 7 months ago (2 children)

    How much is that per centimeter?

  • source
  • hideshow 2 child comments
  • [–] 3 points 7 months ago (1 child)

    Is anybody held accountable or are there any incentive structures to prevent it from happening in the future?

  • source
  • hideshow 1 child comment
  • [–] 2 points 7 months ago

    I saw this recently

    "Even so, the numbers are staggering. The section between Whangarei and Te Hana is expected to cost $15.3-18.3 billion, and this doesn’t include the cost of the Warkworth to Te Hana section which is expected to start construction next year and was most recently estimated to cost $2.9-3.8 billion.

    Combined, that’s $18.2-22.1 billion – which is incredible for a road that for most of its length carries only 10-15,000 vehicles a day.

    To put the cost a different way: if usage of the road more than doubled to 30k vehicles per day (which is more than most parts of the Waikato Expressway) over a 30 year span, that would still work out at nearly $70 per trip include the cost of operating and maintaining the road."

    https://www.greaterauckland.org.nz/2025/10/21/rons-reality-needs-to-bite/