▲ 18 ▼ $22 billion on just one 95km road ($232 million per km) (www.greaterauckland.org.nz) submitted 7 months ago by rimu@piefed.social to c/politics@lemmy.nz 10 comments fedilink hide all child comments (everyone knows roading budgets usually blow out - the total final cost of Transmission Gully appears to be $2.5bn – double the projected cost of $1.25bn).
[–] philanthropicoctopus@thelemmy.club 5 points 7 months ago (2 children) How much is that per centimeter? permalink fedilink source hideshow 2 child comments replies: [–] freshcow@lemmy.world 4 points 7 months ago (1 child) $2320 per cm; or $232 per mm permalink fedilink source parent hideshow 1 child comment replies: [–] philanthropicoctopus@thelemmy.club 2 points 7 months ago Thanks That's absolutely insane. Imagine if that was the number in the proposed plan. Would have been squashed instantly permalink fedilink source parent
[–] freshcow@lemmy.world 4 points 7 months ago (1 child) $2320 per cm; or $232 per mm permalink fedilink source parent hideshow 1 child comment replies: [–] philanthropicoctopus@thelemmy.club 2 points 7 months ago Thanks That's absolutely insane. Imagine if that was the number in the proposed plan. Would have been squashed instantly permalink fedilink source parent
[–] philanthropicoctopus@thelemmy.club 2 points 7 months ago Thanks That's absolutely insane. Imagine if that was the number in the proposed plan. Would have been squashed instantly permalink fedilink source parent