By way of thanks I offer pictures of this crazy job. I ended up having to run a hose into my house to soak the dryset quickerete. I don't care what anyone says I'm not mixing cement in my house. The whole slab is supported on top of 2" floor insulation on top of a leveled bed of crusher dust.

Addition photos in comments

top 6 comments

sorted by: hot top controversial new old
[+] 12 points 11 months ago* (2 children)
  • [–] 3 points 11 months ago

    Neat approach to dealing with the clean out.

    Glad you went with concrete, it really is the best answer. Even if it was imperfect, it's would still be better than wood, since it's not structural.

  • source
  • [–] 3 points 11 months ago

    Good work, thanks for the follow up!

  • source
  • [–] [S] 2 points 11 months ago
    [–] [S] 2 points 11 months ago