Howdy all. I have a 33% avg grade, highly overgrown slope (~450' length, ~160' elevation change) at the edge of my property that was originally used by a railroad company 130 years ago to slide trees down to where they were building railroad ties. It is now exclusively a deer path (the poo on my knees can attest to that) and I had to scramble at several points to get up.

If you were in my deer poo covered shoes (and assuming I had cleared all the brush and fallen trees), would you build trail stairs, e.g.

or a small set of switchbacks (space is tight as I have like 30' of width to play with), e.g.

orrrrr would you just clear it out well and deal with sprawling for a few steeper parts? (my least favorite option as I would like to hike this several times a week when it's done)

I'm concerned with long-term maintenance but am willing the put in the upfront work! TIA

you are viewing a single comment's thread
view the rest of the comments
[–] [S] 2 points 9 months ago

Thank you very much for the feedback! Ok it's looking like logs and pegs for me then as the maintence sounds crazy for switchbacks.

Also the link is very helpful as outside of some work-for-stay stuff for Bob Peoples back in the day, I've done very little trail work.

  • source
  • parent