you are viewing a single comment's thread
view the rest of the comments
[–] 15 points 1 year ago* (last edited 1 year ago) (6 children)

The issue is not the statewide consumption. The Texas water grid is not one unified system. It's a patchwork of local aquifers, municipal supplies, and private wells.

If a datacenter is built in an area with a water grid that can not handle its consumption, people will run out of water sooner or later.
(Especially AI) Datacenters are built in areas with low energy costs, as it is their biggest expense, with no regard for the local water levels:

... about two-thirds of new data centers built or in development since 2022 are in places already gripped by high levels of water stress.

Water is often the last consideration when making siting decisions for data centers because it’s cheap compared to the cost of real estate and power, said Sharlene Leurig, a managing member of Fluid Advisors, ...

- https://www.bloomberg.com/graphics/2025-ai-impacts-data-centers-water-data/

  • source
  • parent
  • hideshow 6 child comments
  • [–] 5 points 1 year ago (3 children)

    So charge them more for the water. The data center builders are making rational decisions based on their costs.

  • source
  • parent
  • hideshow 3 child comments
  • [–] 2 points 1 year ago (1 child)

    Honest question: wouldn't it be advantageous to build data centers in cooler areas next to large body's of water, like the upper Midwest? I'm sure there are metrics I'm ignorant of, but that would seem to make more sense than building in a hot/dry place.

  • source
  • parent
  • hideshow 1 child comment