House built in 1922 with less than 6 ft ceilings. Dug out 100,000 lbs of material and hauled it off in buckets. Took me about 3 months. Now we have 8ft ceilings. Foundation work handled by professional with proper permits.

** progress pics in the replies.

you are viewing a single comment's thread
view the rest of the comments
[–] 3 points 3 months ago (1 child)

As someone who owns multiples of both, Harbor Freight buckets are definitely worse than Lowe's buckets. The Harbor Freight ones never have a flat bottom, which makes it super hard to scrape out all the thinset/hot mud/joint compound/cement/whatever else you're mixing in a bucket.

  • source
  • parent
  • hideshow 1 child comment