you are viewing a single comment's thread
view the rest of the comments
[–] 63 points 11 months ago (1 child)

Power company engineer here, it’s true that a lot of our supporting and analytics software went down during the AWS event.

However, most devices that actually control grid units (called bulk electric system cyber-assets) are air-gapped or utilize a data diode.

FERC Reliability Standards and NERC CIP

However-er, flipping through those standards just now, turns out it’s 100% permitted to connect your “bulk electric system cyber-asset” to a cloud integration if done compliantly.

  • source
  • parent
  • hideshow 1 child comment