14 billion to induce more demand on a corridor that already has eight lanes of road.
Yet they can't get the funding to do the last 500 metres of surface-level bikeway to complete the North Brisbane Bikeway from the CBD all the way to Redcliffe.
14 billion to induce more demand on a corridor that already has eight lanes of road.
Yet they can't get the funding to do the last 500 metres of surface-level bikeway to complete the North Brisbane Bikeway from the CBD all the way to Redcliffe.
I wonder if they're planning road diets on the surface. Maybe some bike lanes, bus lanes and wider footpaths.
(For the record I highly doubt that, but if such a wasteful project were to go ahead that would be the best concession IMO).
all 5 comments