14 billion to induce more demand on a corridor that already has eight lanes of road.
Yet they can't get the funding to do the last 500 metres of surface-level bikeway to complete the North Brisbane Bikeway from the CBD all the way to Redcliffe.
14 billion to induce more demand on a corridor that already has eight lanes of road.
Yet they can't get the funding to do the last 500 metres of surface-level bikeway to complete the North Brisbane Bikeway from the CBD all the way to Redcliffe.