To prep I had to • move our bikes and other gear out of the storage area in ths front

• cleanup and trash various uneeded items from Storage area & crawlspace (which I had to Uhsul to the dump)

•get EVERYTHING out of the crawlspace

• move crawlspace items into Storage area

• move everything back when insulation was finished drying.

you are viewing a single comment's thread
view the rest of the comments
[–] 1 point 1 month ago (1 child)

at 4', might as well have a basement.

  • source
  • parent
  • hideshow 1 child comment