Watch this video ad-free on Nebula: https://nebula.tv/videos/rmtransit-heated-transit-debates-rmtransit-offscript

Another episode of the RMTransit podcast is here! This time, Reece & Dr. Jonathan English talk about different heated transit debates in recent times. Check out Next Metro's Substack page for early access to future episodes.

My Blogs: Public Transit: https://nextmetro.substack.com/ Personal Development: https://cinqpersonnes.substack.com/

My Socials: Twitter: https://twitter.com/RM_Transit Instagram: https://instagram.com/rm_transit Mastodon: https://masto.canadiancivil.com/@reece Bluesky: https://bsky.app/profile/rmtransit.bsky.social

Community Discord Server: https://discord.gg/jfz3fqT

Music from Epidemic Sound: https://share.epidemicsound.com/nptgfg Map Data © OpenStreetMap contributors

you are viewing a single comment's thread
view the rest of the comments
[–] 1 point 1 month ago (1 child)

@reece Also, the latest cost estimate for Stuttgart 21 from June 2026 is 14.5 billion Euros, up from 2.6 billion during the original planning.That is a lot of money to spend on the redevelopment of a car-centric city (that doubles as home for two of the bigger German car manufacturers), whilst the rest of the country's rail network has been suffering from severe under-investment for years and is now in such a bad state that it almost feels like they had sold off the tracks to Union Pacific.

  • source
  • parent
  • hideshow 1 child comment
  • [–] 1 point 1 month ago

    @reece IMO, the relevant question is not wether the finished S21 edifices will look nice when finished (current estimate: December 2031, when the original date was December 2019), but what that money could have been used for otherwise.Also, ignoring cost and time overruns, replacing a 17-track stub station that has been able to handle 45 trains per hour even back in 1970 with an 8-track through-station that can only handle 32 trains per hour does not sound like an improvement to me.

  • source
  • parent