Investigators recovered two stolen trailers carrying $1.3 million in data center supplies, including copper wire and infrastructure equipment.

you are viewing a single comment's thread
view the rest of the comments
[–] 4 points 4 months ago (1 child)

It's firmly mixed though. It's not like there's going to be a spot that fails to cure, it'll just overall cure slower than expected

  • source
  • parent
  • hideshow 1 child comment
  • [–] 4 points 4 months ago

    Only solution is MORE SUGAR.

    On the other hand, curing slower than expected creates its own problems with regard to compressive strength and reinforcement bonding, and that is before you take into account the production delays.

    Gripping hand, any competent engineer is going to see the concrete hasn't cured correctly, and is going to demand it be removed and re-poured.

  • source
  • parent