Yeah modern stuff still has lots of wires. An automated valve may have 4 or 5 wires - open command, open feedback, closed feedback and 0V.
A switch to show something is open or closed will have two wires.
You can put a lot of that stuff on a fieldbus but that is often trading lower install costs for higher ongoing costs and more downtime.