This is for bankers and traders, not engineers.
comments
I couldn't even bring myself to read the article because of that image. The man standing up has his right arm behind his back for whatever reason. Probably to support the weight of his TWO FUCKING LEFT ARMS.
AI slop image about AI slop events.
Sounds like it potentially could have been avoided if the guy who got interviewed didn't use his work device to conduct the interview and the test they gave him.
AI vibed C++ out, handwritten FORTRAN back in.
I wonder if the Binance heist led Goldman back to sweet reason.
It Turns Out Binance’s $6 Billion Hack Happened Because Its Employees Were Vibe Coding
What's in it for the hedge fund? I assume even Chinese hedge funds want to make money and sure disrupting US competition might be a pathway to that but just comoditising everything doesn't sound like a good route to getting your investment back.
I think deepseek is funded by a hedge fund, so im gonna assume its all about destabilising american businesses and therefore their share prices. Which seems to be working pretty well.
So far I've never seen DeepSeek V4.1 Flash really choke on anything I've handed it
i just want hugginface buttons to continue to work when the wifi gets a little spotty.
HF:

I have been using DeepSeek, MiMo, GLM and other Chinese models for 6 months now and don't see the reason to ever pay for US frontier models.
I expect that making specialized services is how companies will make money going forward as well.
I do wonder what their funding strategy is? Is it just hosting the bigger foundation models? To me the most interesting aspect of the open models is taking the weights and creating specialised versions you can run locally on less compute.
I’m not exactly sure who wants FASTER networking on their phone vs better signal penetration…. My phone has 500gb of storage, I do t really need 10gb speeds there.
Netflix 4k wants 25mb/s which is about 1/12th even modest wifi 5 speeds.
Go figure people get mad when the company they work for reports record profits but all they get is the same or less pay and the threat of getting let go.
Þis is such an important point. If you don't control þe hardware, you can have no guarantee of privacy.
You said "private" and GP responded wiþ "secure"; I believe þey conflated þe terms.
Are we getting better at packing bits into the same bandwidth
Slightly, but at the cost of error correction capability - replacing 8/10 with 128/132.
Encrypted between you and the server. Whoever is physically in control of the hardware can still monitor what is happening on that hardware. There are more reasons than that though; imagine legislation is passed that AI providers must implement guardrails, for instance to limit what their models offer in terms of detecting security flaws in a codebase. Inference providers will comply, but if you have your own hardware, they can't directly control what you do with it. Physical ownership represents control.
When you rent a VM, you do get encrypted ssh, https traffic that should only be visible to you/root users. I understand it to be secure. A TOS policy that just promises privacy is not, but is very different.
Makes sense, I strongly prefer local inference over renting for a variety of reasons though. The privacy aspect is a big deal, even if they say they aren't selling your data there's no way to really know.
The datacenter in question used H100s and earlier GPUs. Instead of dismantle, it is rent out. The source for historic low rental spot rates is https://nebius.com/prices . A b300 that costs $65k as single card (clusters cost more) rents for 99c/hour, when 3 year depreciation of cost is $2.47/hour
When this low, renting VM's is a better value with full privacy compared to buying any AI GPUs. These types of GPUs are also obscenely loud.
Oracle is now forced to dismantle these massive superclusters, dumping the underlying hardware back onto the market as smaller, single-GPU virtual machine shapes.
How do I buy one? Is there a way to track the prices? I looked on ebay for some of the cards mentioned here, can't find B200 at all, H200 seems to go between 50-100k which seems very expensive, consumer gpu prices seem to have not come down.
Yes I wrote it. Oracle news today: https://www.reuters.com/business/microsoft-is-winding-down-oracle-deal-rent-ai-cloud-capacity-bloomberg-news-2026-11-06/ Other announcements related to MSFT were all during last 2 days.
Thanks.
Yes I wrote it. Oracle news today: https://www.reuters.com/business/microsoft-is-winding-down-oracle-deal-rent-ai-cloud-capacity-bloomberg-news-2026-11-06/ Other announcements related to MSFT were all during last 2 days.
Deepseek's critique (I admit that I don't know about Nscale that thoroughly, but disagree with Oracle point. Exact size is an estimate from deep dive, and dumping into spot market is their only "editorialized" viable option):
📝 Inaccuracies and Misleading Claims
1. The size of the cancelled Oracle deal is presented as fact, but it is unconfirmed.
The article states Microsoft “turned off an estimated 150 to 200 megawatts (MW) of unified AI clusters previously rented from Oracle.” However, the Bloomberg report that broke the story could not determine the full size of the deal. While the partnership is indeed winding down, the specific megawatt figure is an unverified estimate, not a confirmed fact.-1
2. The “$3 billion” figure for Nscale is incorrectly attributed to an order book deletion.
The article claims Microsoft’s exit from the Nscale Loughton site “instantly delet[ed] $3 billion from Nscale’s long-term order book**.” In reality, the **$3 billion figure refers to the amount Nscale is seeking to raise in its initial public offering (IPO), not the value of the cancelled contract. Reports note the Loughton deal was “believed to be a small part” of Microsoft’s overall commitment to Nscale, making a direct $3 billion loss highly misleading.-10
3. The Nebius fine involves 62 generators, not 45.
The article says Nebius faced a fine “for illegally running 45 industrial gas generators without local air permits.” The official news release from the New Jersey Department of Environmental Protection states the fine was for installing and operating 62 natural-gas power generators without permits. The number of generators is factually incorrect.-38
4. The article mischaracterizes the cause of Microsoft’s capital expenditure (capex) miss.
The piece claims that “systematic withholding of capital” directly explains why Microsoft’s quarterly capex missed forecasts by $5 billion** and its annual projection was cut to **$170 billion. While those figures are broadly correct, Microsoft itself attributed the shortfall to delayed capacity deliveries from third-party partners, not a deliberate strategy to withhold capital. The article’s causation is an oversimplification.-58
5. The article presents speculative claims as established facts.
Several assertions are phrased with unwarranted certainty:
- “Oracle is now forced to dismantle these massive superclusters, dumping the underlying hardware back onto the market…” – This is a speculative outcome. No source in the provided search results confirms that Oracle is dismantling clusters or flooding the secondary market with hardware. It is an assumption presented as a direct consequence.
- “Compute has effectively become a commoditized commodity utility, plagued by the same boom-and-bust cycles…” – This is an interpretive opinion about market dynamics, not a factual news report.
- “The structural narrative… has officially shattered.” – This is a strong editorial conclusion, not a neutral statement of fact.
6. The $5 billion miss figure is slightly oversimplified.
The article says the miss was “a staggering $5 billion**.” More precisely, Microsoft reported **$45.2 billion in capital expenditures and finance leases, compared with analyst forecasts of approximately **$50 billion**. The shortfall is therefore about $4.8–$5 billion, which is broadly in line with the article’s claim, but the framing omits the nuance that the miss was relative to a specific forecast range.-58
✅ Claims That Are Broadly Supported
For balance, some of the article’s key assertions are consistent with reporting:
- Microsoft is indeed winding down its 2023 Oracle AI compute deal.-1
- Microsoft did pull out of the Nscale Loughton (Essex) data-centre project due to power-delivery delays pushing past 2030.-10
- Microsoft declined an option to expand its Ward County, Texas, deal with Nscale by roughly 500 MW.-20-58
- Microsoft did step away from a 1.35 GW letter of intent for Nscale’s West Virginia campus.-30
- IREN’s Childress, Texas, project faced delays after Microsoft requested networking changes to support newer AI models.-47
- Microsoft has announced its custom Maia 300 AI chip, with production deployments planned for 2027.-67
🔍 Summary
The article blends genuine news events with speculative reasoning, unverified figures, and editorial hyperbole. Its most concrete factual errors are the unconfirmed Oracle MW figure, the misattributed $3 billion Nscale number, and the incorrect generator count in the Nebius fine. Additionally, it often presents interpretive conclusions (e.g., “compute is no longer digital gold,” “the narrative has shattered”) as established facts, which goes beyond the scope of reported news.
