[โ€“] 3 points 1 year ago

I read more and apparently the mushrooms were picked by 4yo son and placed on table with mum assuming dad had picked them. Honestly no way of proving that, but if it was what actually happened it's a bit more forgivable but still, dumb as hell.

  • source
  • parent
  • context
  • [โ€“] [S] 3 points 1 year ago* (1 child)

    Over here, there's a culture of picking mushrooms every autumn and it's popular, but absolutely only the ones you know. I am qualified to pick [using Latin because local names would look meaningless] Cantharellus cibarius (easy to tell apart), Lactarius deterrimus (not so easy, but there are no poisonous look-alikes anywhere nearby) and Lactarius rufus (not edible when raw, but we boil + wash them and marinate for winter, due to their borderline edibility they are abundant and long-lasting in nature).

    Among locals, I would be considered a dumb mushroom picker who should learn to recognize a few more edible species, but I can't be bothered, becase I have a garden which overloads me with other produce at the same time when others pick mushrooms.

    Since mushrooms are different in other places, I would not go picking mushrooms further than 500 km from home.

    In case of uncertainty, I would always encourage not taking it.

  • source
  • parent
  • context
  • [โ€“] 4 points 1 year ago (2 children)

    I have to say the biggest warning here to me is: fucks sake people, don't eat wild mushrooms if you aren't an absolute fucking expert. And even then, I'm not sure they are worth the risk for the meagre calories.

  • source
  • [โ€“] 2 points 1 year ago*

    It definitely has. But in my case, I'm not bypassing it - the external part of the charger is communicating to the car using the Type 1 interface and telling "charge at X amps". (But I know that's not applicable to DIY situations.)

    ...and since the tripping occurs within the ramp-up period or very soon after (e.g. on second 7), I'm fairly certain nothing has managed to overheat yet. I think that some generators have poor steering regulators, mine included.

  • source
  • parent
  • context
  • [โ€“] 2 points 1 year ago* (2 children)

    Then take one that can take about 80% of the generator power and feed that into the battery bank. Size the charger to the lower of both numbers.

    80% feels like too much.

    My electric car has a 1600 W charging mode. My emergency gasoline generator supplies 2100 W theoretically if the power factor is 1 (totally resistive load). When I connect my charger in 1600 W mode, the generator trips and drops the load, however. It manages to work at 1200 W or below. And this happens despite the charger having a slow ramp-up behaviour (it doesn't go to full load in a second, but during 5 seconds).

    So based on experience, I would advise to pick a charger that can take 50..60% of the generator's power.

    For a 24V lead acid battery, look for chargers designed for warehouse equipment (forklifts), wheelchairs, truck batteries and such.

  • source
  • parent
  • context
  • [โ€“] 2 points 1 year ago*

    Hey there, the other answer you got was wrong enough for me to register and chime in. There's no such thing as a BMS for lead acid batteries and no way to interact with their internal cells. What you're looking for is called a charge controller, it'll have bulk absorb and float stages just like your solar. As a rough rule of thumb, the amperage of your charger shouldn't exceed your batteries capacity in amp hours, slower is easier on them (but more run time on your genset so...)

    The simplest and most common way to go is with an inverter/charger combo, I've never shopped for a standalone charger and don't have a specific reccomendation. You can totally get away with using a car battery charger though, especially if you're mostly using solar, and they are much cheaper. You can even use a welder, as long as you can set it to ~28.8v and an appropriate amperage (and put it on a timer, obviously won't step down on its own). My neighbor's using a charger from an old scissor lift, ~$200 on ebay, 25A/600w

    If you got followup questions or more details on your setup I'm happy to help, good luck out there

  • source
  • [โ€“] 4 points 1 year ago (1 child)

    I really wish the article would at least attempt to clarify the WHY and the HOW of what I assume is some sort of deed restriction. National Park with residency restrictions? Home Owners Association? Not actually a sale and in fact just a lease? With little to no actual reporting going of in the article past the headline, this feels like either a nothing burger or plain fake/false/misinterpreted reporting to generate engagement. And that, discourages me from wanting to engage any further with my own research.

  • source
  • [โ€“] 1 point 1 year ago* (last edited 1 year ago)

    I'm quite certain that this is some misunderstanding.

    Just like in every country where people don't want to be caught bare-butted in a firestorm, I'm sure that in Belgium too, hospitals, water treatment, military units, air traffic control, rail traffic control, seaports, lighthouses, rescue services, communications hubs, data centers, critical warehouses (e.g. blood bank, vaccine storage, fuel distribution), big data centers and some industries (anything where devices would be ruined by an extended outage) have double or triple redundant power.

    In my book, something becomes an electrical grid when power distribution lines cross from one plot of land to another. In some countries, monopoly to do that might be granted to the national grid company.

    Now, as for housing and construction bureaucracy: it might be entirely possible that it's near-impossible to build a decent-sized house in a normal-looking country (including Belgium) without requesting a grid connection for it. Construction bureaucracy is insane in some lands. They might demand you to build a road and lay plumbing too, just because you're in "zone A" and some local regulation says "all living premises in zone A shall be connected to electrical, water and sewage grids". My advise in that case: don't build a living premise. Build something else but live there. :)

    P.S.

    I also note that Belgium seems to have regulations for microgrids.

    https://www.energuide.be/en/questions-answers/what-are-microgrids/2129/

    Public electricity networks in Western urban areas are extremely dense and also closely monitored. Because macrogrids are highly reliable, microgrids are virtually unnecessary.

    However, efforts are being made to introduce renewable energy into urban environments, too. This is possible through collective self-consumption, for example, where consumers and producers come together as part of a local project (association, cooperative, co-ownership, etc.).

    The principle is simple. Let's say you want to generate sustainable energy, but you're renting an apartment, living in a protected building or your roof isn't suitable for solar panels. You can still form a cooperative with other individuals and generate electricity on the roof of a neighbouring school, office or warehouse, for example.

    In Brussels, the distribution network operator Sibelga and Leefmilieu Brussel are examining the possibilities for collective self-consumption in the capital city.

  • source
  • Nice build! The PIR insulation is a smart choice for temp regulation. If you're looking for comparison metrics, I've found that commercial power stations on gearscouts.com average around $0.80-1.20/Wh for LFP batteries, so your recycled EV cells are a massive value win. DIY is defintiely the way to go for this scale.

  • source
  • [โ€“] 5 points 1 year ago (1 child)

    Check out "Earthbag Building: The Tools, Tricks and Techniques" by Kaki Hunter and Donald Kiffmeyer - it covers the fundamentals that apply to hyperadobe and has been my bible for simlar projects (though you'll need to adapt some techniqes for the mesh bags).

  • source
  • [โ€“] 9 points 1 year ago (1 child)

    It's ok, that 1500 watt output is only for a microsecond before all the 3 cent "power" MOSFETs inside act as fuses.

    More likely, there is enough internal capacitance for the inverter to sustain one (1) half of a full-wave AC cycle at 1500W, after which the overload/low voltage cutout triggers.

  • source
  • In the US you would need #2 [AWG] gauge wire to handle 125amps safely, and that's just handling the current, nothing to do with proper grounding or anything.

    Also just for reference, many older homes in the US would only have 100 amp service from the pole, meaning this thing is pushing more amps than a whole house potentially.

  • source
  • parent
  • context
  • view more: โ€น prev next โ€บ