I noticed that my feeder cable from my sub panel to my main panel is just laying on some of the plumbing, not really attached to the floor joists. We have a final inspection scheduled for Monday and I told him we should cancel it considering there is still MEP work that needs to be done. He says its fine and it will pass final. Am I crazy to think that this work should be done before final inspection? He also said that I don't have a right to stop the inspection even though my opinion differs from their idea of "substantial completion."

Also to add the icing on the cake, I was naive and already paid the invoice he sent for MEP even though there is this issue with the power along with outlets not working, there is still some stuff like the sewer cleanout that needs to be done, and the air conditioning is not working...

 

I have a general contractor who is constantly fighting me on things. I call him out for crappy work and he hand waves it away saying it’s not a big deal. This bathtub issue is probably the worst of it and I was wondering if maybe you can help me understand it.

We were 1 day away from stucco when I noticed this bathtub issue and took these pictures. In the picture we are looking up to the ceiling above a recessed front door into the floor beneath the bathroom.

If we filled the bathtub up, wouldn’t it just drain into this ceiling area? I think it’s just wide open into the tub and the knockout is on the 4” drain pipe.

I could see up into the drain so I assumed it was not connected and we were about to be in for a world of problems. First he says it’s an alternate drain and it’s done right. Then his plumber comes by and says oh shit this isn’t done and fixes it. Now after the fact he says nothing would have happened because of the knockout cover.

Thank god it’s fixed (hopefully) but I’m trying to get him to acknowledge the monumental failure.