Cheaper than other building materials, but still pricey, it’s over double what it was when I started 5 years ago.
For reference, one 2”x8” that’s 10’ long costs $20 and gets me 3 boards at 39”. That’ll cover 2’ of pathway.
So 20’ of pathway would need 10 boards at $200(ish), while the stone would need 1.1 cubic yards. The stone can be anywhere from $50-$300 a yard depending on type.
Concrete without doing a base is $350 a cubic yard.
Also, in Canada, so not much different than USA for pricing.






