I'm in a hard spot with a heat exchanger machine. On one hand I love it because the build quality is top notch, parts availability is excellent, and on and on, but on the other hand it takes about 15-20 minutes minimum for the E61 group head to warm up.
Measuring beans, grinding, and puck prep is pretty quick. 2 or 3 minutes.